Website handoffs
Website Client Handoff Checklist and Template
Hand over a finished website with an asset inventory, editing instructions, ownership checklist and support contacts. Includes a copyable handoff record.
A website handoff needs three parts: the files and documentation, access to the services the client will manage, and a clear record of who handles future changes. Check each part with the person taking over. Use the handoff record below to capture the result, rather than treating a launch email as the end of the project.
Agree who will run the website
Identify who will update content, manage hosting, renew the domain and handle technical faults. One person may do all four jobs, or a client may use several suppliers. Record the responsible contact for each service and confirm that the client knows how to reach them. Ownership and support arrangements should match the project agreement.
Ask the future editor to name a common task: changing opening hours, adding a team member or replacing a homepage image. Build the handoff around those tasks. A long tour of every setting is less useful than instructions the editor can follow when the next real update arrives.
Prepare the file package
- Approved assets: the logo variants, images and other files used on the site, with names that identify their purpose.
- Content reference: the approved copy or an agreed export, with its date and any known omissions.
- Editing guide: instructions for the agreed routine tasks, including where to find the relevant page or component.
- Source and build notes: only the agreed source files, with the instructions and dependencies needed by the next developer.
- Service register: the domain, hosting, site platform and connected services, with an owner and support contact for each.
A file package is not automatically a restorable website backup. If a backup is part of the handoff, describe what it contains, where it can be restored and who has tested that process. Dynamic content, databases and externally hosted media may need separate treatment. Do not label a folder of design exports as a complete website backup.
Transfer access through the services themselves
Use each service’s supported invitation or ownership-transfer workflow. Ask the intended owner to sign in and verify the access they need. Record the result in the handoff, but keep passwords, recovery codes and API keys out of the general file package. A delivery link transports files; it does not transfer a domain or change a hosting account’s owner.
For a developer handoff, identify the repository and deployment process separately from the asset download. Check that the next maintainer can find the current source and the documented setup. Use the source packaging guide when an editable project or source archive is included.
Copyable website handoff record
WEBSITE HANDOFF Website / release date: [URL and date] Client owner: [name and contact] FILES AND DOCUMENTATION Asset package: [delivery link and release label] Editing guide: [file or location] Source / build notes: [agreed location or not included] Backup: [scope, location, restore owner and test status] SERVICE ACCESS Domain: [service / owner / access confirmed] Hosting: [service / owner / access confirmed] Site editor: [service / editor / access confirmed] Other services: [service / owner / next renewal] ACCEPTANCE Routine edit tried by client: [task and result] Open items: [item / owner / next action / date] Support after handoff: [scope and contact] Client files saved: [confirmation / follow-up date]
Run a small handoff rehearsal
In a fictional café project, the owner’s first task might be changing the opening hours. Let the owner follow the editing guide in the agreed environment, then check the result together. If the guide skips a step or the account cannot perform the action, resolve that before calling the handoff complete. Record any task that needs a developer instead.
Review outstanding items explicitly. “Photo replacement awaiting the owner’s selection” identifies a next action; “a few small things remain” does not. The client asset request template can help collect anything still missing without reopening the entire intake.
Deliver the documentation and close the loop
SentIt can collect the agreed exports and documentation into one delivery using uploads and selected Google Drive or Dropbox files. Explain what the package contains and when the client should save it. Keep service access separate, and ask for confirmation that both the downloads and the required accounts work.
Save the final handoff record with your own project archive, along with the exact package you sent. The project archiving checklist covers the release record and a restore check so the delivery link is not the only place the handoff survives.